Volume Floor and Sample Route
The MOQ is 50 pcs per design. After receipt of the measurement plan, burgundy standard and rib-depth brief, a sample generally requires 7-10 days.

Private Label Men's Knitwear Manufacturer
A burgundy crew-neck tee whose pronounced neck, sleeve and hem ribbing frames a regular silhouette.
OEM/private-label development from a China clothing factory, with fit, fabric, trims and bulk QC confirmed before production.
Final commercial values depend on fabric, quantity, trims and packaging.
Product overview
A burgundy crew-neck tee whose pronounced neck, sleeve and hem ribbing frames a regular silhouette. Best for Autumn color stories, elevated teamwear capsules and boutique lifestyle separates.. We can develop the final product from your tech pack, reference garment or a shared set of product notes.
Buyer answer summary
These quick answers cover the main details buyers usually check before sending an RFQ.
The MOQ is 50 pcs per design. After receipt of the measurement plan, burgundy standard and rib-depth brief, a sample generally requires 7-10 days.
Once the sample is signed off and materials have reached readiness, the expected bulk period is 15-30 days.
Use the sample to confirm the main knit appearance and the exact relationship among neck rib, sleeve cuffs and lower band before bulk release.
The inspection brief can compare burgundy shade, neckline form, sleeve balance, chest and length tolerances, rib measurements and workmanship with the approved reference.
Development can cover rib scale, silhouette, shade, subtle mark placement, neck and care labels, hangtags and packing configuration.
Send the technical measurements, color code or physical reference, logo artwork, branding instructions, packaging details and exact size quantities.
Record neck, cuff and lower-band depths as a coordinated ratio for each size group. If one edge is revised, review the other two visually so the original framed appearance is preserved.
A subsequent order should cite the approved burgundy reference, product code and prior specification, with any deliberate color change called out separately. Each new production lot still requires its own buyer sign-off.
Ready to develop?