Launch Threshold and Prototype
The starting MOQ is 50 pcs per design. Allow about 7-10 days for a sample after the size specification, panel layout and zip direction are settled.

Private Label Men's Knitwear Manufacturer
A light-stone zip-collar polo combining a geometric chest band with a small-scale textured body.
OEM/private-label development from a China clothing factory, with fit, fabric, trims and bulk QC confirmed before production.
Final commercial values depend on fabric, quantity, trims and packaging.
Product overview
A light-stone zip-collar polo combining a geometric chest band with a small-scale textured body. Best for Design-led golf ranges, modern hospitality apparel and city-resort polo edits.. We can develop the final product from your tech pack, reference garment or a shared set of product notes.
Buyer answer summary
These quick answers cover the main details buyers usually check before sending an RFQ.
The starting MOQ is 50 pcs per design. Allow about 7-10 days for a sample after the size specification, panel layout and zip direction are settled.
Following approval of the sample and confirmation that materials are ready, the bulk stage typically requires 15-30 days.
Before production, confirm the geometric repeat, horizontal panel position, body texture, collar build and zip opening on the physical sample.
Inspection points can monitor panel alignment, left-right balance, zip operation, collar shape, key dimensions and surface consistency.
The buyer may specify zip appearance, color combination, panel proportions, fit, labels and retail packing.
Send the measurement chart, panel or visual reference, color standards, logo files, zip preference, labeling details and planned size quantities.
When an embroidery or badge is planned, its size and coordinates should be tested against the geometric band rather than positioned independently. Send the artwork at actual scale so both elements can be reviewed together.
Define the body, geometric motif, collar and zip as separate numbered color zones in the brief. This makes a two-tone or tonal interpretation clear before the first physical sample is built.
Ready to develop?